Construction estimates
- Loft conversions
- House extensions
- Basement conversions
- Refurbishment & renovation
- New builds
from £190 per estimate
Find out moreEstimates and contract administration for construction projects – London and across the UK. Reliable, and presented the way UK architects and clients expect.
from £190 per estimate
Find out morefrom £200 per week
Find out moreProblems preparing or running a building contract in the UK? Give me a call.
CallI confirm the fee for the estimate
I issue an invoice for 100% of the fee – payable before work on the estimate begins
I email you the completed estimate
Rates based on Spon's Price Book and on final accounts of real London projects.
A client/architect-facing estimate plus a contractor's report with cost, margin and resources.
Consultations in Polish or English, documents in English – ready to send to your client.
Locations are shown by area/postcode district only, to respect client confidentiality.
Roof and external elevation repairs
House alterations and refurbishment
Alterations and refurbishment
Phase 1: demolition, structural works, drylining, landscaping
Flat refurbishment
Flat refurbishment
Flat refurbishment
House alterations and refurbishment
House alterations, refurbishment and landscaping
Ground floor refurbishment
House alterations and refurbishment
Patio extension
House alterations and refurbishment
Alterations and refurbishment
Flat refurbishment
Rear extension and widening of garden steps
House alterations, refurbishment and landscaping
Phase 1: demolition, structural works and drylining
Estimates start from £190, depending on the type and size of the project – see the fees page for details. I confirm the final fee once I’ve seen your drawings.
Drawings (PDF/DWG), a specification or scope of works, the site address (the postcode is enough) and the date you need the estimate by.
Three documents: an ESTIMATE (PDF) for your client or architect, a contractor’s REPORT (PDF) and the CALCULATIONS (Excel), where you can adjust profit and labour rates.
Turnaround depends on the next free slot in my schedule. I confirm the date when I accept the job.
Yes. I’m happy to talk it through in Polish or English, and the documents are prepared in English, ready to send to your client.
Rates from Spon’s Architects’ and Builders’ Price Book, combined with experience of settling contracts in London. You can also give me your own labour rates and margin.
Once you confirm the job, I issue an invoice for 100% of the fee, payable before I start work on the estimate.
Yes. I cover London and the Home Counties, and prepare remote estimates for projects anywhere in the UK.
I'll reply with the fee and turnaround time.